Skip to main navigation.

Distributed Generation

Navasota Valley Electric Cooperative seeks to provide our members with the best electric service possible, and at the lowest cost consistent with sound economy and good management.  If you are interested in installing your own electric power generation equipment, we are ready to work with you to ensure that your generation equipment is installed in a proper and safe manner.  The following table summarizes our Distributed Generation program and requirements.

 

Generation Size Category Power Purchase Category Application Fee Insurance Requirement Short Form Contract Long Form Contract
Less than 5 kW Net Metering $50 Liability X  
5 kW to 50 kW Net Metering $100 Liability   X
51 kW to 100 kW Avoided Cost $100 Liability   X
101 kW to 1 MW Avoided Cost $500 Liability   X
Over 1 MW to 3 MW Avoided Cost $500 Liability   X

 

For more information, please download our Distributed Generation Procedures and Guidelines Manual for Members.

Distributed Generation Procedures and Guidelines Manual for Members

Distributed Generation Application

Short Form Contract (Less than 5 kW)

Long Form Contract (Greater than 5 kW)

 

Please submit additional questions, applications, and contracts to:

Kayla Sanders

ksanders@navasotavalley.com

979-828-6431

 

Powered by Touchstone Energy Cooperatives Logo